The scope of work for this project will include, but not necessarily be limited to, the following:
  • Assistance in the identification of project funding sources and assistance in the completion of funding applications;
  • Geo-technical services;
  • Design of projects;
  • Including:
    1. Site Grading
    2. Storm Water Detention Systems
    3. Utility Design including Water, Sewer, Electric, Telephone and Cable
    4. Roadway Design
    5. Permits
  • Preparation of bidding and contract documents;
  • Obtaining easements and other property if necessary;
  • Survey, construction administration and inspection;
  • Coordination with existing projects being pursued by the Authority; and,
  • Any other services that may be required.

Location

City :

Hamlin

County :

Lincoln

Miles To Nearest Interstate
  Or 4 Lane Highway:


18.0

Miles To Nearest
  Commercial Airport:


36.0

Rail Access :

None

Navigable Waterways:

None

Size and Utilities

Site Acreage :

248.5

Electric :

American Electric Power

Water :

WV - American Water Company - Cost $233,000

Gas :

Allegheny Power

Sewer :

Hamlin PSD - Cost $30,000